Show All

Hengelo, Matière tunnel system

General information


Matière tunnel system
Designing, prefabricating and building of a 64 meter long Matière tunnel in Hengelo.

Involved parties


Client: municipality Hengelo

Managing board: municipality Hengelo

General Contractor: TBI Haverkort (Mobilis)


 


 Numbers/technique used


 


– Matière tunnel system, build out of prefabicated elements (total length: 64 m, surface = 40 m2)



Location

Share this project