General information
Matière tunnel system
Designing, prefabricating and building of a 64 meter long Matière tunnel in Hengelo.
Matière tunnel system
Designing, prefabricating and building of a 64 meter long Matière tunnel in Hengelo.
Client: municipality Hengelo
Managing board: municipality Hengelo
General Contractor: TBI Haverkort (Mobilis)
Numbers/technique used
– Matière tunnel system, build out of prefabicated elements (total length: 64 m, surface = 40 m2)