General information
Railway tunnel was made to provide free passage for road around Gourdon. The tunnel was lifted with hydraulic jacks and then skidded during a weekend closure.
Railway tunnel was made to provide free passage for road around Gourdon. The tunnel was lifted with hydraulic jacks and then skidded during a weekend closure.
General contractor: Eiffage TP
Engineering: EGIS JMI
Client: RFF / SNCF
Partner: Scales
Mass: 1400ton
Skidding distance: 42m