Belgium, lowering four decks highway junction Lummen

General information


For the renewal of the highway junction Lummen in Belgium, Jan de Nul was commissioned to build four bridge decks. CT deBoer supplied the formwork supports and after the concrete work was done, the decks were lowered 90 cm above the serving motorway E313. The formwork supports were lowered and loaded on a trailer in a number of night-time closures. Some time later the lowering of the bridge decks was done.

Involved parties


Client: Flemish Government

Managing board: Wegen en Verkeer Limburg

General contractor: Jan de Nul


Numbers/ technique used


– Mass bridges respectively: 4.200 tons en 4.100 tons

– Jacking height: 90 centimeter

– High-stroke jacking system used (stroke: 1600 mm)


Period


July – August 2011 (deck 1 & 2)&

July – August 2012 (deck 3 & 4)


Location

Share this project